The Analysis Statistics Report is the next level of detail from the Analysis Charts. The second of 2 reports neatly display 4 key Project elements on 1 page. The Analysis Statistic Report is easy to produce and ideal for Schedule Manager reporting.
The illustration above is a sample output of a typical Analysis Statistics Report (2 of 2).
- Duration Type: Details the Duration Type of every activity categorized by Activity Type.
- Percent (%) Complete Type: Details the Criticality of every activity categorized by Activity Type.
- Duration Threshold: Details all Non-Milestone activities and categorizes Activity Type.
- Free Float activities count with distribution by Activity Type.
The Original Duration Threshold limits are User defined. The values are entered in the Criticality/Duration Assignment Module found under the Settings menu.